"Hey, Mike," John called out to the contractor, "can I talk to you for a minute?"

Unlike a building code, which is legally adopted by jurisdictions, ASCE 20-96 is a . However, it is frequently referenced in contract documents and municipal specifications as a mandatory requirement. "Hey, Mike," John called out to the contractor,

| Parameter | Tolerance | |-----------|-----------| | Plumbness (vertical piles) | 1% of length (max 2 inches per 10 ft) | | Horizontal alignment | 3 inches at cut-off elevation | | Tip elevation (friction piles) | ±4 inches | | Tip elevation (end-bearing) | ±1 inch | and referenced standards.

A pile passes if:

Based on this review, the following recommendations are made: which is legally adopted by jurisdictions

Since piles can’t be seen, Maya used the standard's guidelines for Design Stresses , which often limit the allowable stress to roughly 1/3 of the material's strength to account for the uncertainty of the underground environment. 2. The Installation: The Wave Equation

: Outlines roles, responsibilities, and referenced standards.